Factory & Production
ISO 9001:2015 certified. 15,000 m² production floor. 80+ skilled artisans and engineers.
15,000 m²
Production Facility
80+
Skilled Workforce
42 Countries
Export Reach
50,000/mo
Production Capacity (m²)
Quality Control Process
Every product passes through a 5-stage QC checkpoint: raw material inspection, in-process review during assembly, UV accelerated aging tests, fire certification batch sampling, and final pre-shipment inspection with photographic documentation.
Production Capabilities
- • HDPE injection molding lines for green wall panels
- • Steel core fabrication for monumental trees
- • Hand-sculpting studio for FRP rock formations
- • PU bark texturing and painting workshop
- • Integrated waterfall pump assembly and testing
- • UV chamber accelerated weathering lab
- • Fire testing documentation lab