Site logo
AN

Artificial Plant Factory China

ISO 9001:2015 certified. 15,000 m² production floor. 80+ skilled artisans and engineers.

15,000 m²
Production Facility
80+
Skilled Workforce
42 Countries
Export Reach
50,000/mo
Production Capacity (m²)

Quality Control Process

Every product passes through a 5-stage QC checkpoint: raw material inspection, in-process review during assembly, UV accelerated aging tests, fire certification batch sampling, and final pre-shipment inspection with photographic documentation.

Production Capabilities

  • • HDPE injection molding lines for green wall panels
  • • Steel core fabrication for monumental trees
  • • Hand-sculpting studio for FRP rock formations
  • • PU bark texturing and painting workshop
  • • Integrated waterfall pump assembly and testing
  • • UV chamber accelerated weathering lab
  • • Fire testing documentation lab

Inside the Production Floor

The facility runs four lines under one roof, which is why a project mixing green walls, trees and rockwork ships on a single container rather than three.

Green wall line
HDPE injection moulding for the panel base, then hand-planting of UV-stabilised stems. Each panel is graded for stem density and colour variation before it is boxed.
Tree assembly
Steel cores are cut and welded to the load case of the specified height, then bark-textured and hand-wired with leaves. Tall specimens are built in sections that rejoin on site.
FRP sculpting studio
Rock formations and waterfall shells are sculpted by hand from a master mould, so geological grain varies between units instead of repeating.
Test laboratory
UV accelerated weathering and fire sample retention sit on site, which is what allows a batch certificate to be issued against your specific production run.

How an Order Moves Through the Plant

The sequence is the same whether the order is one tree or forty panels, which is why a mixed container can ship on a single date.

Drawing release
Approved fabrication drawings go to the floor with a material schedule. Nothing is cut before this is signed, because a change at this point is free and a change after is not.
Material and mould preparation
HDPE, steel section and FRP resin are drawn against the schedule, and any new mould is cut. Mould lead time is the step that no amount of production capacity compresses.
Fabrication and finishing
Panels are moulded and planted, trees welded and wired, rockwork sculpted and painted. Each line runs its own QC checkpoint rather than passing everything to a single end-of-line inspection.
Batch testing
Fire samples are retained from the actual batch, and UV panels go into the weathering chamber. This is what allows the certificate to name your production run rather than a generic product.
Crating and loading
Packed by assembly section against a keyed plan, with the installation sequence documented. Container loading is planned around the site's access, not only around volume.